- Client: A.S.P Company with cooperation of private sector
- Consultant: Tal-tav Consulting Engineers
- Location: Tabriz
- Construction duration: 39 months (according to the schedule)
- Completion: under construction
- Construction cost: 335 billion Rials
- Construction method: EPCF
- Project usage: Residential
- Number of floors: 2 Towers, 13 floors each
- Land Area: 4,600 m2
- Total Area: 23,000 m2
- Project location: Shahrak ‘e’ Roshdieh, Tabriz