Project Details

  • Client: Iranian Energy Organization
  • Consultant: Engineering Organization of Ministry of Power
  • Location: Tehran Province- Tehran County
  • Duration: 36 months
  • Completion: 1995
  • Construction cost: 3.090 billion Rials
  • Project usage: administrative
  • Number of floors: 6 floors
  • Total Area: 6,500 m2
  • Project location: End of Phase 6, Shahrak-e Gharb, Tehran

Inspired by Iranian architecture, central yard has been incorporated in this building. It has glass roof with 9-meter span, which contains fountain and green space. The façade is composed of black and grey granite as well as white cement façade, aluminum windows, and reflex glass. It possesses two elevators, library, conference hall and educational space, complete self-service, and dining hall having a capacity of 200 people.

(Final parts of finishing works are not among the scope of A.S.P Company contract)