Project Details

  • Client: Iranian Energy Organization
  • Consultant: ATEC Consulting Engineers
  • Location: Tehran Province- Tehran County
  • Duration: 38 months
  • Completion: 1996
  • Construction cost: 3 billion Rials
  • Project usage: laboratory, industrial
  • Number of floors: 5 floors
  • Total Area: 11,000 m2
  • Project location: End of Phase 6, Shahrak-e Gharb, Tehran

The building of Chemistry and Mechanic Laboratory Complex is one of the most harmonious and beautiful buildings of Power Research Center.

Apart from having variety and different surface, it possesses special harmony and beauty.

The Power Research Center Laboratories Complex includes A, B, and C blocks, each constructed in five floors. This complex has reinforced concrete structure with joist decks. The façade is made of black granite. Mechanical installations of the complex include fan coil for administrative parts and corridors, two-way ventilation system for classrooms and conference halls, one-way ventilator system for laboratories, emergency electricity, and voice messaging systems.